We have been undertaking physical and ecological surveys for over 70 years. Browse what we have been up to recently.
ABPmer was commissioned to undertake an estuarine hydrodynamic and coastal process assessment of the Cruise Hull Project to inform a feasibility study and the start of the marine licence process.
ABPmer was commissioned to evaluate the hydrodynamic and sedimentary implications of two potential designs for deep-water berthing facilities at Douglas Harbour.
ABPmer is commissioned by Jacobs on behalf of Low Level Waste Repository Limited to inspect the coastline surrounding the LLW Repository site between St Bees and the Ravenglass Estuary.
To further develop a hydrodynamic numerical model of Southampton Water, ABPmer was contracted to design, plan and conduct a comprehensive oceanographic data collection campaign.
ABPmer was asked to undertake four ADCP survey transects to help Marina Projects Ltd better understand the currents in Beaulieu River to inform development considerations.
ABPmer was contracted by the Environment Agency to record the sediment properties in the intertidal zone of the Bristol Channel and Severn Estuary coastlines, between Sharpness and Porlock Bay.